Achtung! Letzter Tag für die Warenannahme ist in diesem Jahr der 19.12.2024 12:30 Uhr. Ab dem 08.01.2025 sind wir an allen Standorten wieder wie gewohnt für Sie da!

SCHEIDT switchgear houses & buildings

References

References we are proud of
Behind our well-known customers are a large number of switchgear house projects and buildings that are designed for the future. As intelligent as the SCHEIDT solutions are for this, they fit perfectly into the big picture - as a reference that shows: Everything is as it should be. Let us advise you personally, whatever you are planning. SCHEIDT has plenty of experience to offer.
Bad Oeynhausen municipal utilities
"Auf der Nemphe" in Frankenberg

Bad Oeynhausen municipal utilities

Request:
Ensuring consistent, good water quality for the city's residents with around 13,800 house connections to the mains network. In demand: buildings for use as pressure boosting systems, pumping stations, filter and well systems.
SCHEIDT solution:
  • Water treatment system for 30 m³/h
  • Water treatment system for 100 m³/h with separate control room
  • Pumping station up to 160 m³/h incl. emergency generator room
Result:
Everything done right with SCHEIDT! The measurement results to the north and south of the Werre document that the limit values for drinking water, which flows through more than 430 kilometres of underground supply pipes, have not been exceeded.
Bad Oeynhausen municipal utilities

"Auf der Nemphe" in Frankenberg

Request:
Integration of a walk-in transformer station without a basement in the city centre.
SCHEIDT solution:
  • Walk-in transformer station without basement
  • Arc fault proof
  • with attractive wood panelling for seamless integration into the cityscape
  • Roof area as a "recreational area" for city visitors
  • Only the expert can see that a transformer station is hidden there
Result:
Ensuring a continuous urban power supply while optimising space utilisation without endangering pedestrian traffic.
"Auf der Nemphe" in Frankenberg

Further application examples in practice

Bremerhaven
For the world's longest power quay, Container Terminal 4 in Bremerhaven (1681 metres long), SCHEIDT supplied the cable ducts, among other things.
Wind turbines
Delivery of 21 SCHEIDT stations for the Uetze wind farm (Lower Saxony), Total output: 31.5 MW.
Photovoltaic systems
  • Delivery of a 500 and 1000 kW station for two roof systems in Laimering (Bavaria), 1064.9 kWp FV output.
  • Delivery of an FV system for a hall roof in Tödtenried (Bavaria) with a total FV output of 494.9 kWp.
Bremerhaven
For the world's longest power quay, Container Terminal 4 in Bremerhaven (1681 metres long), SCHEIDT supplied the cable ducts, among other things.
Biogas plants
Delivery SCHEIDT SYSTEM BEK 300-650, transformer generation: 1250 kVA; Transformer own consumption: 250 kVA.
Cable ducts
  • Halle-Leipzig: Production and delivery of 380 cable ducts within 4 months.
  • Container Terminal Bremerhaven: Cable ducts for the electrical and data supply as well as energy supply points for refrigerated containers.

Transformer houses and buildings from SCHEIDT

SCHEIDT INDIVIDUAL SH

SCHEIDT INDIVIDUAL SH

Transformer house

SCHEIDT INDIVIDUAL BW

SCHEIDT INDIVIDUAL BW

Building

en_GB